TRUSTWORTHY SCHEDULES

Practical AI Tools

The AI-driven smart planning in InEight Schedule offers practical help for building and maintaining project schedules. Unlike opaque “black box” AI systems, our tool leverages your company’s own knowledge library of realistic, historical schedules. Use the library and our AI-enhanced templates to quickly import or create accurate, customizable plans. Then, refine details ranging from high-level work breakdown structures to terminal-level specifics. 

InEight Schedule product shot
 

Accelerated Planning

Start Smart with Proven Practices

InEight Schedule speeds up plan development using realistic schedules as starting points, basing them on your as-built data. It integrates best practices for robust schedule creation and enables early identification of potential issues. Users can conduct what-if scenarios at any project stage for effective problem-solving and planning.

AI Transparency

Quicker Plans, Greater Control, Visibility Redefined

InEight Schedule’s practical AI tools offer accelerated planning, greater control over project schedules, and enhanced visibility into potential outcomes. Quick-start with realistic templates, adjust with built-in flexibility, and conduct in-depth what-if analyses to model and manage project scenarios.

InEight Schedule product shot
Z

AI-Enhanced Templates

Practical AI tools enable quick setup, starting with AI-driven templates from the knowledge library for realistic, adaptable scheduling.

Z

Built In Best Practices

The AI suggestion engine’s guidance offers strong scheduling best practices as a starting point, and throughout your project. But you can make changes  to suit your specific project needs.

Z

What-If Analysis: AI-Driven Scenario Modeling

Effortlessly conduct what-if scenarios at any project stage with our AI engine. Our comprehensive and analysis, includes cost and resource implications, for informed decisions.

Capital Construction Is Changing. Are You Keeping Pace?

You’re right: Typical construction scheduling practices struggle to meet the demands of an increasingly complex industry. It’s time for a new approach.

%

53% of capital construction projects are delivered late

%

Only 8.5% of infrastructure
projects deliver on time. 1

%

Design-build projects will represent 47% of all spending by 2026